Centralized Monitoring at ENOSA Piura Control Center

Deploying centralized video wall control and display management systems across critical energy infrastructure marks a major advancement in modernizing real-time power distribution operations. This innovative solution enables continuous, 24/7 visual supervision of critical power distribution networks, giving operators and dispatchers a clear, comprehensive view of SCADA systems and operational workflows across the regions of Piura and Tumbes.  

In close collaboration with system integration partner Check Point Advertainment, 4TheWall deployed advanced visualization controllers and software infrastructure to establish a resilient monitoring platform for ENOSA (Electronoroeste S.A.). The use of high-performance display controllers and workstation integration tools enables control room teams to monitor live grid feeds, organize complex telemetry data, and significantly enhance overall operational decision making.  

Environment Challenges

Managing regional power distribution requires uninterrupted surveillance across extensive electrical infrastructure. As part of an effort to expand its real-time monitoring capacity in Piura, ENOSA identified a clear need for a centralized, high-availability visualization platform to supervise SCADA systems and integrate operator workstations into a single operational surface. This technology aimed to provide a standardized, high-reliability visual management setup, ensuring operators could easily view and interpret live telemetry and system interfaces.  

Check Point Advertainment delivered the detailed engineering, including stabilized power protection, cable tray routing, grounded support structures, and 20-meter optical HDMI connections to maintain zero operational downtime during mission critical 24/7 operations.  

Technology Solutions

To establish high reliability, zero-latency visual management, 4TheWall implemented a centralized architecture powered by Wall28 controller systems and high-performance signal extenders: 

  • Wall28 Video Wall Controllers: Powers the 5 x 2 video wall to ensure stable, high fidelity and multi-source processing output for continuous 24/7 operations.  
  • 4TheWall Optical-Fiber HDMI Links: Ten 20 meter 4K capable optical fiber links overcome long-distance transmission constraints between the server room and the monitoring room while preserving absolute signal integrity 
  • Designer V6 management software: Manages the ten displays as one unified visual workspace, allowing layouts to be created, scaled and positioned dynamically. 
  • ODM Software Licenses: Integrates operator workstations directly with the main video wall surface to seamlessly stream SCADA interfaces and desktop applications. 

The Impact

  • Centralized SCADA and operational application monitoring on a single 5 x 2 visual workspace.

  • Enabled operators to share workstation content directly to the video wall for faster situational awareness.

  • Provided flexible layout control, allowing sources to be positioned, resized, scaled, and adapted to different monitoring scenarios.

  • Created a reliable visualization platform designed to support continuous 24/7 control room operations.

  • Improved supervision efficiency by transforming ten displays into one unified operational canvas.

 

Download the success story